Adaptive Signal Technology
Identify bottlenecks on key corridors where intelligent systems can be installed to detect when signals need to change. The result will be improved system management, increased vehicle flow, less congestion, and fewer emissions from idling vehicles. These are initial steps in implementing Regional Transportation Management Centre (RTMC) and Intelligent Transportation Systems (ITS).
Connection to Plan: Action 1.1.1 Create a Regional Transportation Management Centre
High Occupancy Vehicle (HOV) Lanes
Investigate prime candidates for HOV lane placement and enact a pilot program to encourage more people to rideshare and use fewer vehicles. This could include potential conversion on Magazine Hill, as well as exploration of opportunities at Cogswell District and Barrington Street, and Bayers Road and Robie Street, in consultation with HRM and Halifax Transit.
Connection to Plan: Action 1.1.3 Peninsula Core Streets & Access Corridors
Macdonald Bridge Corridor Review
Conduct a rapid review, in partnership with HRM, of the Angus L. Macdonald Bridge corridor (North/Oxford to Nantucket/Victoria Road) to incorporate intelligent traffic signal technology that uses real time data along with potential improvements to the intersections leading to the span.
Connection to Plan: Action 1.1.3 Peninsula Core Streets & Access Corridors
Young Street (Halifax) Corridor Review
Identify improvements for intersections on the corridor, as well as adjustments to access. It will include deploying intelligent signal technology that uses real time data to operate the corridor efficiently during peak commuting times.
Connection to Plan: Action 1.1.3 Peninsula Core Streets & Access Corridors
Review Active Transportation Projects to Preserve Existing Road Capacity
Pause potential active transportation projects that could impact the capacity of key routes and intersections and explore options to future-proof pathways to allow for safe pedestrian and cycling commuting, separate from high volume commuter corridors.
Connection to Plan: Action 1.1.3 Peninsula Core Streets & Access Corridors